top of page

Preliminary Design Scheme

 

  • Design Development & 3D modeling

 

  • Development of Preliminary Schemes to inform a direction of the project from client discussions.

 

  • 3D model with all design intent clearly shown or described to proceed to DA /CC documentation.

 

  • Finalise all amendmenmts to be signed off during Preliminary  Development phase allowing incorporation of additional considerations.

PreDevelopment Application

 

  • Prepare Preliminary Design drawings for Development Application submittal.

 

  • Develop preliminary drawings based on a final signed off 3D model, incorporating council and client requirements.

 

  • Assemble all necessary documents required by Council to gain approval for a DA and/or Construction Cert.

 

  • Prepare Site layout and design to conform with Survey information. 
     

  • Prepare all required plans including reduced levels and room layouts.Street elevations and typical cross-sections through the building.

Development Application + Construction Certificate

 

  • Amend drawings in accordance with Pre - DA requirements. Including all input from council officers and client instructions.

 

  • Finalise Site layout in conformance with Survey information and Geotechnical considerations.

  • Finalise all floor plans, elevations and coordination of Structural Engineering design.

 

  • Preparation of drainage plans and all additional documentation required for council submission.

  • Materials & Finishes Schedule. Window & Door schedules

 

  • Prepare BASIX documentation.

Additional Services

  • Provide plans and documents for Construction Tender with preferred builder.

 

  • Bill Of Materials (BOM) listing for preliminary construction costing of project materials and finishes.

  • Video animation at finalisation of the 3D model.

  • Fixtures and Equipment Schedule to assist in project cost control.

  • Acquire fee proposals for additional Consultant services.

Note: not all services are described herein. Refer to your personal quotation for details.

bottom of page